See what happens after 100 days install of Shore Sox Ersion Control System!
Project with Southwest Florida Water Management: Before and after Shore Sox was installed on the Florida Canal 18. Please notice the contour cut on canal 18. There was no heavy equipment brought into this project or collateral damage to the enviroment. Once installed vegetation restores, filtration of nitrates and phosphates occure. Thus slowing the sediment process growing at the botoms of our lakes. The Growth of sediment from erosion of the shore line,can kill aquatic life, fill in lakes with a soft sediement.
After shore Sox was installed directly into the existing shoreline without any excavation!
Installation before backfill and planting.